archive-eu.com » EU » C » CHAPLIN-PROJECT.EU

Total: 10

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • High Power Transmission Line Cable Inspection
    Skip

    Original URL path: http://www.chaplin-project.eu/ (2015-12-29)
    Open archived version from archive


  • Main page - High Power Transmission Line Cable Inspection
    CHAPLIN project is funded by the European Commission under the 7th Framework Programme FP7 Research for the benefit of specific groups Research for SMEs The overall aim of CHAPLIN is to develop and demonstrate an integrated technology solution for the

    Original URL path: http://www.chaplin-project.eu/1.html (2015-12-29)
    Open archived version from archive

  • Overview - High Power Transmission Line Cable Inspection
    line cables The proposed NDT technique for this project is Long Range Ultrasonic Testing LRUT This technology will allow inspection of the full volumetric cross section area of a cable for many metres with minimum number of points of access NDT data as well as defect Global Positioning System GPS information will be transmitted over wireless communications links to a data centre for analysis The system will be capable of

    Original URL path: http://www.chaplin-project.eu/2.html (2015-12-29)
    Open archived version from archive

  • Activities - High Power Transmission Line Cable Inspection
    on complex geometrical cable structures requires a good understanding of the theory behind wave propagation For this reason this WP is dedicated to theoretical studies and modelling WP3 Sensors and laboratory trials This work package will translate the development from the numerical modelling into practice WP4 Wireless data communication and signal processing The main aim of WP4 is enhance the quality of information obtained from the inspection data this is by developing a software algorithm using advanced signal processing WP5 Power electronics and encapsulation The main aim of WP5 is to develop hardware that can harvest the magnetic fields into electronic power as well as make sure that the electronic equipment is compatible with the environment appropriate to the operation of the cable WP6 System integration and testing Due to the complexity of the development within the CHAPLIN project the core objective of this WP is to integrate the different types of technologies within the project into a condition monitoring system WP7 Site trials and demonstration This work package will focus on conducting site trials if possible on a real live sample of the cable WP8 Consortium Management Reporting to the REA The overall objective of WP8 is to ensure

    Original URL path: http://www.chaplin-project.eu/3.html (2015-12-29)
    Open archived version from archive

  • Consortium - High Power Transmission Line Cable Inspection
    to drive the transducer development side of the project inputting in to the sensors and laboratory trials WP3 specifically for sensor and sensor array development and the theoretical studying and modelling WP1 Lead SME in Power electronics and Encapsulation WP3 through their extensive experience in protecting electrical systems that operates in harsh environmental operating conditions Provide expertise in electrical and electronic system integration for WP6 NDT inspection company that able to conduct the site trials hence key contributor to WP7 for site trails and demonstration As well as having the client base and associated access to the overhead power cable energy generation business Albatroz will ensure the new guidelines and procedures needed will be in a format to facilitate industry acceptance Technical Project management Ultrasonic guided waves hardware and electronics Leader for WP1 System Specification WP2 NDT study Modelling and WP6 Site Trials Demonstration TWI have a membership base involved in the power sector including major utilities involved in electrical power generation both underground and significantly to the CHAPLIN project using overhead cables Innora will support the integration of the system WP6 working closely with Robotnik Their mechatronic skills will also benefit the power electronics WP5 and overall they possess

    Original URL path: http://www.chaplin-project.eu/4.html (2015-12-29)
    Open archived version from archive

  • Gallery - High Power Transmission Line Cable Inspection
    High Power Transmission Line Cable Inspection Main page Overview Activities Consortium Gallery Downloads News Events Contact FP7 CHAPLIN FP7 SME 2012 315130

    Original URL path: http://www.chaplin-project.eu/5.html (2015-12-29)
    Open archived version from archive

  • Downloads - High Power Transmission Line Cable Inspection
    Consortium Gallery Downloads News Events Contact Cambridge 10M Meeting Kick Off Meeting Deliverables 10M Technical progress update KOM Introduction to FP7 D1 1 10M WP2 KOM Introduction LRUT D1 2 10M WP3 KOM Project Management 10M WP4 KOM D E

    Original URL path: http://www.chaplin-project.eu/6.html (2015-12-29)
    Open archived version from archive

  • News - High Power Transmission Line Cable Inspection
    High Power Transmission Line Cable Inspection Main page Overview Activities Consortium Gallery Downloads News Events Contact FP7 CHAPLIN FP7 SME 2012 315130

    Original URL path: http://www.chaplin-project.eu/7.html (2015-12-29)
    Open archived version from archive